欧美高清熟妇啪啪内射不卡自拍,日韩少妇内射免费播放18禁裸乳,免费观看18禁无遮挡真人网站,精品久久亚洲中文无码

AC source power & DC source power manufacturing factory

Calculating method of alarm current

As we all know, the capacity selection of AC power supply equipment is very important.choosing the right AC power supply is very important for production, manufacturing, testing and R&D!

excessive capacity selection will increase unnecessary property investment; too small capacity selection will affect the normal production, testing and R&D process and even lead to unusable.

therefore, mastering and understanding the calculation of alarm current will clearly know how to choose the capacity of AC power supply equipment. Suitable power supply equipment will make people feel like a tiger!

AC power supply is divided into single-phase power supply and three-phase power supply according to the different output power.therefore, the calculation method of alarm current can also be divided into two kinds: single-phase power supply and three-phase power supply.
the following are introduced separately:

One:Single-phase power supply
Output 0-300V: divided into low and high gear.the alarm current of low-voltage gear is 120 V, and that of high-voltage gear is 240V. capacity (VA)/gear voltage (V)=gear alarm current (A).

Take 5KVA power supply as an example: 5000VA (capacity)/120V (low grade)≈42A; 5000VA/240V (high grade)≈21A.so we get the alarm current: the output of 5KVA power supply is in the range of 0 -150V, the maximum alarm (limit) current is 42A; the output of 5KVA power supply is in the range of 0 -300V, and the maximum alarm (limit) current is 21A.

Output 0-600V, low-grade 240V, high-grade 480V, the same method to get the alarm current of 21/10.5A.
The simple method is that we only need to calculate the low-grade or high-grade alarm current. Another kind of alarm current can be obtained immediately according to the low-grade alarm current = 2 times the high-grade alarm current

Two: Three-phase power supply
The alarm current is a single-phase alarm current, so the three-phase power supply needs capacity/3 to get the single-phase capacity, and then according to the calculation method of the alarm current of the single-phase power supply, the alarm current of the three-phase power supply can be obtained.

Take three-phase 15KVA power supply as an example: 15KVA/3 = 5KVA, 5000VA/120V≈42A (low-grade alarm current), 42A/2 ≈21A (high-grade alarm current).therefore, the alarm current of three-phase 15KVA power supply is 42/21A.

It is not difficult to find that the calculation of alarm current focuses on the unit of capacity is VA, the unit of voltage is V, and the unit of alarm current is A. Therefore, if the known unit of capacity is KVA, the unit of KVA should be converted to VA when calculating the alarm current. 1KVA is 1000VA.
Recommend Products
Online service
Service Hotline
86-769-89616802
86-13602353727

ADMIRE POWER
欧美s码亚洲码精品m码| 国产精品成人无码久久久| 男人激烈吮乳吃奶视频免费 | 久久久精品2019免费观看| 无码国产精品一区二区vr老人| 无遮挡又黄又刺激又爽的视频| 国产人妖视频一区二区| 中文字幕日韩人妻在线视频| 无码专区永久免费av网站| 日日碰日日摸日日澡视频播放| 无码人妻丰满熟妇啪啪网不卡| 日本最新免费二区三区| 海角国精产品免费| 亚洲自偷精品视频自拍| 亚洲午夜久久久久久久久电影网| 久久久久无码精品国产h动漫| 国产在线观看免费观看| 麻豆国产成人av高清在线观看| 女人与牲口性恔配视频免费| 午夜男女很黄的视频| 麻豆国产av超爽剧情系列| 中文字幕人成乱码熟女| 久久av高潮av无码av喷吹| 国产欧美日韩中文久久| 伊人久久大香线蕉综合影院首页| 日韩中文字幕免费视频| 久久婷婷五月综合97色直播| 亚洲av综合色区无码二区爱av| 精品国产成人亚洲午夜福利| 国产人妻高清国产拍精品| 欧美变态口味重另类在线视频| 99久久婷婷国产综合亚洲| 人禽无码视频在线观看| 久久人人爽人人爽人人片av高请| 久久国产精品-国产精品| 人人爽久久涩噜噜噜丁香| 成年女人毛片免费观看97| 中文字幕一区二区三区日韩精品| 国产午夜福利久久精品| 亚洲av无码专区国产乱码4se| 色爱无码av综合区|